Banbury 2 mixing plantKobelco
DEFU-BB270 Mischer (NP/P)
Banbury 2 mixing plant
Kobelco
DEFU-BB270 Mischer (NP/P)
Year of construction
1973
Condition
Used
Location
Fulda 

Show images
Show map
Machine data
- Machine type:
- Banbury 2 mixing plant
- Manufacturer:
- Kobelco
- Year of construction:
- 1973
- Condition:
- used
- Functionality:
- fully functional
Price & Location
- Auction start:
- 15.12.2025 at 08:55 o'clock
- Auction end:
- 22.01.2026 at 10:00 o'clock
- Location:
- 36 Fulda, Deutschland

Call
Details about the offer
- Listing ID:
- A20790382
- Reference number:
- 2760002
- Update:
- 18.12.2025
Description
Technical Details:
Banbury Kneader/Mixer No. 2 with peripheral equipment
Itodpfx Ahjx Itdrs Usr
Documented Modifications/Upgrades:
Year Modification/Upgrade
1973 Installation of 2 × 38" ASM batch-off units – Banbury II
1979 Beth filter for Kneader II
1981 Extraction system for Kneader 2 solvent tank
1985 Temperature control unit for Kneader 2
1994 Automatic unloading system for Mixer No. 2
2008 Vibration measurement system for Mixer II
2008 Demag manipulator for Mixer I (2x)
2009 Power quality interface measuring device for kneader
2009 Ergonomic upgrade for rubber splitter
2010 CMS system for Mixer II
2010 TCU upgrade for Mixer II
2014 BB 270-6W mixer head transfer unit (HTU) for Kneader II
2015 Monitoring system (Kneader I–III) for CMS Kneader II
2015 Replacement of outdated computers and UPS for Mixer 2
2015 Installation of autorelease terminals Mixer II
2017 Hopper for Mixer No. 2
2018 Mixer 2 MS Version 4
2018 Sheet feeding system Mixer 2
2021 Replacement of mixer body / serial no. 16439
2022 Mill gearbox Kneader 2
Control system: CMS system, TCU upgrade, computers and UPS replaced
Maintenance/Condition: Regular upgrades and modernizations documented (1973–2022)
Accessories/Options: batch-off units, sheet feeding system, hopper, drop gate, roll head with conveyor belt, mill, dip tank, cooling line, stacking unit
The listing was translated automatically. Translation errors are possible.
Banbury Kneader/Mixer No. 2 with peripheral equipment
Itodpfx Ahjx Itdrs Usr
Documented Modifications/Upgrades:
Year Modification/Upgrade
1973 Installation of 2 × 38" ASM batch-off units – Banbury II
1979 Beth filter for Kneader II
1981 Extraction system for Kneader 2 solvent tank
1985 Temperature control unit for Kneader 2
1994 Automatic unloading system for Mixer No. 2
2008 Vibration measurement system for Mixer II
2008 Demag manipulator for Mixer I (2x)
2009 Power quality interface measuring device for kneader
2009 Ergonomic upgrade for rubber splitter
2010 CMS system for Mixer II
2010 TCU upgrade for Mixer II
2014 BB 270-6W mixer head transfer unit (HTU) for Kneader II
2015 Monitoring system (Kneader I–III) for CMS Kneader II
2015 Replacement of outdated computers and UPS for Mixer 2
2015 Installation of autorelease terminals Mixer II
2017 Hopper for Mixer No. 2
2018 Mixer 2 MS Version 4
2018 Sheet feeding system Mixer 2
2021 Replacement of mixer body / serial no. 16439
2022 Mill gearbox Kneader 2
Control system: CMS system, TCU upgrade, computers and UPS replaced
Maintenance/Condition: Regular upgrades and modernizations documented (1973–2022)
Accessories/Options: batch-off units, sheet feeding system, hopper, drop gate, roll head with conveyor belt, mill, dip tank, cooling line, stacking unit
The listing was translated automatically. Translation errors are possible.
Seller
Note: Register for free or log in, to access all information.
Telephone & Fax
+49 8151 ... show
These listings may also fit your interest.
Clickout
Fulda
1,028 km
Mixer
KobelcoDEFU-BB270 Mischer (NP/P)
KobelcoDEFU-BB270 Mischer (NP/P)
Your listing has been deleted successfully
An error has occurred























































































































































